Our Services

Erosion Control

Erosion Control

Grading & Excavating

Grading & Excavating

Pile Installation

Pile Installation

Erosion Control

Site preparation for Solar Farm installation requires the pre-planning and engineering to avoid expensive fines from the respective governmental agencies. CITORI goes to great lengths during the site grading process to properly protect the solar farm site from stormwater. One heavy rain event can cause major delays and unwanted expense if proper steps have not been taken to manage the run-off.

erosion-control-bg-01

Solar Site Grading & Excavating

Solar site preparation requires equipment and knowledge that is very different from typical residential or commercial grading. With over 100 farms prepped, CITORI can provide the confidence needed to ensure your site is ready for pile-installation and erosion avoidance. Our crews work fast and accurate to keep your solar project on schedule and within budget. 

excavating-bg-01

Solar Pile Installation

Solar site preparation is the very foundation of a successful solar farm. Our crews utilize hydraulic pile-drivers to install the solar piles combined with sophisticated GPS instrumentation to properly place each pile. Having overseen the installation of over 800 MW on over 4000 acres, we understand the exacting requirements needed for pile-driving. Our crews also understand how to work with many different soil types and the required techniques to install throughout the Southeast.

solar-pile-bg-01
Contact Us

Thanks for your interest in Citori Site Development. Drop us a line and we'll get back to you as soon as we can. Thanks!

Not readable? Change text. captcha txt

Start typing and press Enter to search